Albarrie Geocomposites is now introducing a new product called an Oil Boom. This product has been developed for customers that would like a more inexpensive secondary oil containment system. It has been designed to contain any released oil from escaping their site.
Below is a typical cross section of the Oil Boom consisting of a simple trench and backfilled clear stone.

The existing earth that was removed is placed back in the 4” trench on either side of the Oil Boom and compacted.

In the cases where the soil is unstable 1 x 2 stakes are used. The Oil Boom is again placed in the excavated trench and stakes are installed at a separation distance that is required. The stakes must be flush with the top of the Oil Boom.

The Oil Boom is then backfilled as previously done with the existing earth and then the clear stone.

Again additional clear stone may be required to achieve the desirable slope. A 1:1 slope is the minimum.
If you have any questions concerning the installation of this product please contact the undersigned.
Prepared by: Mike Dowds
Albarrie Geocomposites